Watson and Hillhouse Piling Equipment

LATEST NEWS

KOWAN ZU-100 ASSISTS IN NEW WATERWAY PROJECT IN HAMBURG, GERMANY

Watson & Hillhouse’s ZU-100 Still Worker is currently being used, to install AZ20-700 & AZ37-700 piles ranging from 6 to 17 metres long, in the city of Hamburg, Germany to create a new waterway from the city to Hamburg-Wilhelmsburg, ...

Contact Details

Main Depot:
T: +44 (0)1473 748652
F: +44 (0)1473 240090
E: info@w-h.co.uk

Northern Depot:
T: +44 (0)1925 265358
F: +44 (0)1925 261112
E: info@w-h.co.uk

Service & Parts

National and international service and back up

Service Fleet

On-site maintenance can be provided anywhere in the world, while in the UK our service engineers' fully equipped service vehicles are fitted with the latest GPS Satellite tracking systems and mobile telephone link up, which means any of our engineers can be located and re-directed to a breakdown as soon as the call is logged. Should conditions, circumstances and requirements change on site, our large stocks of piling equipment are kept ready for immediate despatch.

Parts

We realised from the onset of trading that to provide and maintain our equipment to a high standard and to provide a first class service back up, it was essential for us to hold comprehensive stocks of spares.

Follow the links on the left of this page to learn more